Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 5 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
All pressure gauges used for hydrant testing shall be calibrated at least every _____, or more frequently depending on use.
CorrectIncorrect -
Question 2 of 5
2. Question
When measuring the pitot pressure of a stream of practically uniform velocity, the orifice in the pitot is held downstream approximately _____ the diameter of the hydrant outlet or nozzle opening, and in the center of the stream.
CorrectIncorrect -
Question 3 of 5
3. Question
When flow testing hydrants, pitot readings of less than _____ psi and more than _____ psi should be avoided, if possible.
CorrectIncorrect -
Question 4 of 5
4. Question
When performing a hydrant discharge test, if a pitot gauge is not available to measure the hydrant discharge, a _____ gauge tapped into the hydrant cap can be used.
CorrectIncorrect -
Question 5 of 5
5. Question
What is the theoretical discharge through a 3 inch diameter circular orifice with a pitot pressure of 9 psi?