Quiz Summary
0 of 10 questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- (other) 0%
- IBC 0%
- NFPA 101 0%
- NFPA 70 0%
- NFPA 72 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 10
1. Question
The Miller act requires that performance and payment bonds be obtained for all government projects over $_____?
CorrectIncorrect -
Question 2 of 10
2. Question
According to the IBC which of the following is considered an I-3 use group is? (Select Three)
CorrectIncorrect -
Question 3 of 10
3. Question
Consider space which is 85′ x 56′ with the ceiling at 15 feet AFF. The ceiling is level and has beams which are 2 feet deep and spaced at 8 feet on center. The beams run parallel to the 85 ft length of the room. Based on this, _____ smoke detectors are required?
CorrectIncorrect -
Question 4 of 10
4. Question
According to the IBC, high rise buildings are required to be provided with voice and alarm communication signaling. An exception is provided for _____?
CorrectIncorrect -
Question 5 of 10
5. Question
Consider a new ambulatory health care facility. Occupant notification shall be accomplished automatically _____ upon operation of any fire alarm activating device?
CorrectIncorrect -
Question 6 of 10
6. Question
Which of the following is a responsibility of the project manager? (Select Three)
CorrectIncorrect -
Question 7 of 10
7. Question
Wall mounted telephone appliances shall be not less than _____ inches AFF?
CorrectIncorrect -
Question 8 of 10
8. Question
Which of the following requires a visual inspection frequency of quarterly? (Select Two)
CorrectIncorrect -
Question 9 of 10
9. Question
Consider a customer who requests a verbal change to a project in progress. Based on this, a formal _____ should be written?
CorrectIncorrect -
Question 10 of 10
10. Question
A review of voltage calculations on a fire alarm project reveals a NAC circuit with 16 AWG solid coated copper conductor which has a total of 350 feet of wire. The circuit is 24 VDC. The circuit current is 0.78 amps. Based on this, the project manager suggests switching to 18 AWG solid coated copper. The total resistance of 18 AWG based on this circuit is _____ ohms?
CorrectIncorrect